Second Storey Addition · Etobicoke & Mimico

Second Storey Addition Mimico

Mimico's lakefront streets are lined with 1930s–1960s bungalows and semis that are ideally suited to second storey conversions — and rapid gentrification means the neighbourhood now supports the investment. Kopman Build has been building second storey additions in Etobicoke since 1999, managing everything from structural engineering to City permits to final occupancy.

Why Mimico clients choose Kopman Build

Mimico sits at the western edge of Toronto's lakefront, and its housing stock — predominantly one-storey bungalows and semis built between the 1930s and 1960s — makes it one of the strongest markets in the GTA for second storey additions. With lakefront proximity driving demand and gentrification reshaping the neighbourhood block by block, adding a full second floor is often the most financially sound decision a Mimico homeowner can make.

Older Etobicoke homes present specific structural considerations: foundations, load-bearing walls, and roof framing from this era often need engineering review and reinforcement before a second storey can be added. Kopman Build brings the experience to assess, plan, and execute these conversions properly — not as a theoretical exercise, but as contractors who have done it repeatedly in this neighbourhood and know exactly what to expect.

Dustin Kopman founded the company in 1999 after growing up in construction through his family's firm. Every project is led by someone who understands the craft, not just the contract.

Second storey addition scope in Mimico

Full Second Storey

Complete second-floor additions on Mimico bungalows — doubling your living area while maintaining the architectural character of the street.

Structural Engineering

Foundation assessment and load-bearing reinforcement for 1930s–1960s Etobicoke homes, coordinated with certified structural engineers.

Permit Management

Full City of Toronto building permit applications, Committee of Adjustment filings where required, and coordination through occupancy.

Design Integration

Architectural detailing that blends the new second storey with your existing home's profile — no jarring transitions or mismatched cladding.

Interior Build-Out

Full interior finishing of the new floor: bedrooms, bathrooms, hallways, and staircases designed and built to match your brief.

Mechanical & HVAC Extension

Extending heating, cooling, plumbing, and electrical systems into the new second storey, fully permitted and inspected.

How we work on every project

  1. 01

    Consultation

    We visit your Mimico property, assess the existing structure, listen to your goals, and document the project in writing — scope, budget, and timeline.

  2. 02

    Pre-Construction Estimate

    A detailed line-item estimate with allowances and contingencies, so you know the number before committing to anything.

  3. 03

    Permits & Planning

    We manage all permit applications, structural engineering, and City approvals — nothing falls through the cracks.

  4. 04

    Construction

    Full-time site supervision, weekly updates, and open-book cost tracking throughout the project.

  5. 05

    Handover

    Structured handover with all documentation, warranties, and a 12-month attendance window post-completion.

Questions about second storey additions in Mimico

How much does a second storey addition cost in Mimico?

A second storey addition on a Mimico bungalow typically runs $350,000–$650,000+ depending on the footprint, structural complexity, and finish level. Mimico's 1930s–1960s housing stock often requires upgraded foundation work and load-bearing reinforcement, which should be accounted for in any realistic estimate. Kopman Build provides a detailed line-item pre-construction estimate before you commit.

Do I need a permit for a second storey addition in Mimico, Etobicoke?

Yes. A second storey addition in Mimico requires a building permit from the City of Toronto. Depending on your lot coverage and proposed height, a Committee of Adjustment minor variance application may also be required. Kopman Build manages the full permit process, including drawings, engineering, and City submissions.

How long does a second storey addition take in Mimico?

From initial consultation to occupancy, a second storey addition in Mimico typically takes 14–20 months: roughly 4–8 months for design, permits, and approvals, followed by 8–14 months of construction. We provide a realistic project schedule at the start so there are no surprises.

Is adding a second storey worth it on a Mimico bungalow?

In most cases, yes. Mimico is undergoing rapid gentrification driven by lakefront proximity and strong demand for larger homes in Etobicoke. A well-executed second storey addition can double your living space and significantly increase resale value — often returning more than the construction cost in a neighbourhood where move-up buyers are actively competing for larger detached homes.

Double your space in Mimico.

Kopman Build builds second storey additions on Mimico and Etobicoke bungalows. No-obligation consultation — we come to your property.

Request a Consultation